Pozo del Compromisso

Alternate Names: FT39

Includes:T91 Lower White House Mine -RCA6 - Boulderosa - T105 Italianos - T144 Rosario - FT39 Pozo del Compromisso - FT40

LOCATION, ENTRANCE, DESCRIPTION, SURVEYS, REFERENCES


CO-ORDINATES: 30T X:360780 Y:4785920
ALTITUDE: 1820m
LENGTH: 291m (2300m including all Sistema Ramazosa)
DEPTH: -180m (-402m to terminal chamber in Boulderosa)


LOCATION:

From Caseton de Andara, follow the markings for the Lake Depression (Pozo de Andara). At the obvious junction (before reaching the lake area) take the left hand path that zig zags up the side of the mountain, until the obvious mine area is reached. 40m after the track takes a hairpin bend a big shaft (5m in diameter) should be visible on the left of the track next to a ruin


ENTRANCE:

5m diameter shaft, 15m pitch

Picture: Entrance


DESCRIPTION:

1st pitch, from the surface, is 15m deep leading to a short passage. A P16 is reached, which in order to achieve a free hang it is necessry to rebelay just below a huge block held up by 2 rotten beams.

At base of pitch is a large cone of mine debris in a passage of 2m by 3m which descends rapidly. In two places there are rotten wooden ladders which should be handled with precaution.

On the right is a large passage, which leads to a network of mine levels connecting back to FT40. For roughly 30m the passage is horizontal before climbing back to top of a P18, the base of which is choked. Just before the passage rises, on the left, is rock(?) to small 6m pitch (split into 2 sections) which is followed by a P12 (Adrenalin Shaft) which has a loose takeoff and is hard to rig.

Two small pitchs of 5m and 4m follow in a rift, from which a 30m long passage (70cm wide) leads down steeply to a P12 of 4m diameter. At the base of this pitch is squeeze that has been dug out, followed by a small chamber with an aven. A second dug out squeeze follows, to a 4m climb, followed by the last 17m pitch. At the bottom the passage quickly becomes too tight.


SURVEYS:


REFERENCES